Seeco Logo Banner


Automatic Fault Isolation through SCADA with One Source and               Multiple Switches (Loop Circuit)

 

 

   
Video will loop continuously  
   
Equipment Typical RTU Control Settings
(3) Group operated switches, any brand or configuration Valid fault 'event' if current >= 1100 amps for 3 cycles
(3) SEECO motor operators AND potential is lost at 10 seconds
(6) SEECO current only sensors, type CS  
(3) SEECO current and voltage sensors, type CSVS  
(3) RTU's and comm devices - customer specified Typical Breaker Timing
(1) Existing supervisory control system (SCADA) 20 cycles
  15 seconds
Note: RTU capable of calculating fault direction 60 seconds
 

Note: the above breaker timing and CVD control settings are for illustration purposes only; your application may have values that are specific to your automation objectives and current equipment settings

 


Home | About Us | What's New | Contact Us | FAQ

For More Information
Copyright © 2016 [SEECO] All rights reserved.
Southern Electrical Equipment Company, Inc.